15Oct/10oTm

Florian: Bike build

enFriday: the frame is ready, we move on to the wheel building and the complete assembly of the bike for a test ride. Monday the frame goes to the powder coating, RAL 6005 Moss green.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

frVendredi: le cadre est prèt, on passe au rayonnage des roues et à l'assemblage complet du vélo. Lundi le cadre ira à la peinture epoxy, RAL 6005: vert mousse.

Filed under: Classes By: oTm
Comments (0) Trackbacks (0)

Sorry, the comment form is closed at this time.

Trackbacks are disabled.