21Apr/15oTm

Jérôme titane: triangle avant

enWater bottle bosses arrived, they're now welded and the front triangle is tacked and welded. Tomorrow, chainstays.

enLes inserts de porte bidon sont arrivés, le pointage et le soudage du triangle avant est fait. Demain les bases.

Filed under: Workshop By: oTm
Comments (0) Trackbacks (0)

Sorry, the comment form is closed at this time.

Trackbacks are disabled.