21Apr/15oTm

Jérôme titane: triangle avant

enWater bottle bosses arrived, they're now welded and the front triangle is tacked and welded. Tomorrow, chainstays.

enLes inserts de porte bidon sont arrivés, le pointage et le soudage du triangle avant est fait. Demain les bases.

Filed under: Workshop By: oTm
10Apr/15oTm

Jérôme: Titanium road frame

enI started the work on Jérôme's Titanium road bike frame, tubes are mitered, internal brake cable tube is in place, waiting for some water bottle bosses and the front triangle will be ready for welding.

enJ'ai commencé le cadre de route en titane de Jérôme, les tubes sont grugés, le passage de gaine de frein interne est en place, j'attends un réapprovisionnement d'inserts de porte bidon avant de passer a la soudure.

Filed under: Workshop By: oTm
3Apr/15oTm

Swanee: suite et fin

enReaming, facing, alignment check and test build. Swanee has built a very nice frame and fork this week, thanks a lot for being the 1st courageous women to take the framebuilding course. I wish you all the best for your future projects, keep us posted !

enFraisage, alésage, alignement et montage test. Swanee repart avec un ensemble cadre/fourche printemps/été 2015 très "tendance". Il me reste a te dire merci d'avoir eu le courage d’être la première stagiaire chez oTm, je te souhaite bonne chance pour tes futurs projets, tiens-nous au courant.

Filed under: Classes By: oTm